五月婷婷丁香激情av,国产精品精华液网站,欧美色乱一区二区麻豆,久久久久久久久极品内射

NewsHome > News > Industry dynamics

Secret Record of Maintenance and Maintenance of Grazing Machine
release time:2019-3-28 15:49:00      hit count:1726

Daily pre-start check

1. Check oil and coolant leakage, record tire damage, hose extrusion deformation, bolt loosening or edge wear.

2. Removal of debris, residues and garbage from loose areas of bulldozers or discs

3. Check and ensure that the bulldozer slides and the top surface of the disc are clean.

4. Ensure that the safety signs are clean and in good condition. If damaged, lost or blurred, replace in time.

5. Clean the cockpit glass and check that all rearview mirrors are in place.

6. Before starting the grader, make sure that all the tools and other unfixed items on the machine are clear.

7. Visual inspection of brake fluid level through translucent main cylinder container. The liquid level should be at the flange of the container, not more than 1 inch from the top of the cap.

8. Check once a week or 50 hours of work. The daily pre-startup inspection method should also be used during the inspection.


Previous: Precautions for cement pavement construction: preparation before paving
Next: What if the drill pipe of rotary drilling rig drops slowly?

Back to list

News you are interested in
渭源县| 古交市| 平阳县| 林州市| 石门县| 新丰县| 萨嘎县| 分宜县| 青海省| 乐平市| 广河县| 鸡东县| 大田县| 广宁县| 镇巴县| 保定市| 秦皇岛市| 永修县| 布尔津县| 会昌县| 师宗县| 额尔古纳市| 鸡西市| 库尔勒市| 商水县| 华容县| 宁波市| 大邑县| 太原市| 乌拉特中旗| 宜章县| 阳春市| 长泰县| 麻栗坡县| 古交市| 彭阳县| 通海县| 稷山县| 陆河县| 松潘县| 兴城市|